The daily production report (DPR) is the official record of a shoot day: call and wrap times, scenes scheduled versus shot, cast hours, and anything that went wrong. It's what payroll, insurance, and the producer's “are we on schedule?” question all run on. This is a blank DPR template as an Excel file, with a filled-in Day 1 from a sample production, Nightfall.

What's in the template

  • Day Report — the headline numbers: crew call, first shot, lunch, wrap, scenes scheduled / completed / partial, pages, setups, weather.
  • Cast Times — call, arrival, on-set, and wrap per actor, plus meal penalties. This is what overtime and turnaround are calculated from.
  • Notes & Incidents — delays, equipment problems, schedule changes, near-misses — with the action taken and who reported it.

Day report

The example day is honest: 4.00 pages scheduled, 3.25 shot, Scene 12A half done because the rain came early. Over three days that scheduled-vs-shot gap is the truest measure of whether the schedule is real.

Day Report · example from “Nightfall
2 columns
FieldValue
ProductionNightfall
DateTue, May 12, 2026
DayDay 1 of 18
Crew Call06:30
First Shot08:42
Lunch13:00 – 13:30
First Shot After Lunch14:10
Camera Wrap19:05
Crew Wrap19:50
Scenes Scheduled5, 12, 12A
Scenes Completed5, 12
Scenes Partially Shot12A (2 of 4 setups)
Pages Scheduled / Shot4.00 / 3.25
Setups23
WeatherOvercast; rain from 19:00

Cast times

Cast Times · example from “Nightfall
9 columns
#CharacterActorCallArrivedOn SetWrapMeal PenaltyNotes
1MayaDana Whitfield06:4506:4008:0019:05No
2ReyesMarcus Oyelaran07:1507:2008:3012:45NoWrapped early — Sc. 5 only
3OkaforPriya Nair07:1507:1008:3012:45No
4CookTom Barrow09:3009:2510:0019:05NoHeld for 12A

Notes & incidents

Log everything, however small, while it's fresh. The fridge-compressor note is why Day 4's call sheet will say “unplug the fridge.”

Notes & Incidents · example from “Nightfall
5 columns
TimeTypeDescriptionAction TakenReported By
10:15DelayFridge compressor noise in kitchen; 25 min lost re-blocking for sound.Unplugged fridge between takes; props iced the shelves.L. Ferreira
16:40EquipmentSlider plate stripped; 2 setups shot handheld.Replacement from Harbor Camera for Day 2.E. Novak
19:00Schedule12A not completed — rain arrived early, light changed.Remaining 2 setups moved to Day 4 (diner, night).S. Moreau

How to use it

  1. Fill it in at wrap, every day, while it is fresh. It is the official record of what happened.
  2. Record scenes scheduled vs. scenes shot, and pages. Over three days that gap tells you whether the schedule is real.
  3. Log cast in/out times exactly — this is what payroll, overtime, and turnaround are calculated from.
  4. Note every incident, however small: a near-miss, a damaged prop, a late vendor. Insurance and the next day’s plan depend on it.
  5. Send it to the producer and UPM the same night. A DPR that arrives three days later is a diary, not a report.

Common mistakes

  • Writing it the next morning. By then the times are guesses. Fill it in at wrap.
  • Rounding cast times. 12:45 is not 13:00. Overtime and meal penalties are calculated to the minute.
  • Leaving incidents out to look good. The DPR is a record, not a report card. An unlogged near-miss is an insurance problem later.

The DPR closes the loop that starts with the call sheet: what was planned in the morning, what actually happened by night.

Download the template (.xlsx)

7 tabs: a Read Me, a filled-in example for every section, and a blank copy to work in. Free — enter your email and it downloads instantly.

We'll only use this to send occasional production tips, no spam.

Don't want to do this by hand?

morrow keeps the schedule, call sheets, and cast days in one live source, so what was planned and what actually happened are never two different spreadsheets.

Try morrow Free for 15 Days