Free Pre-Production Schedule Template

August 23, 2026

A pre-production schedule is the countdown to day one: every task that has to happen before camera rolls, with an owner and a due date, counted backwards from the shoot. This is a blank pre-production schedule template as an Excel file, with a filled-in eight-week example from a sample production, Nightfall.

What's in the template

  • Week — weeks before day one (Wk −8 … Wk −1), so the sheet is honest about how little time is left.
  • Due, Task, Department, Owner — a task is a deliverable with a name on it, not a department.
  • Status — Not started / In progress / Done / Blocked, and nothing else, so it stays scannable.

The schedule

The example follows the real dependency chain: lock the script, then break it down, then budget, then cast and scout, then permits and gear, then the tech scout and schedule lock in the final two weeks. Notice the market permit is flagged two weeks out — permits are the classic pre-production surprise.

Pre-Production · example from “Nightfall
7 columns
WeekDueTaskDepartmentOwnerStatusNotes
Wk -82026-03-17Lock shooting scriptProductionJ. EllisonDonev4 locked
Wk -82026-03-20Script breakdown completeProductionS. MoreauDone
Wk -72026-03-27First-pass budgetProductionR. KaplanDoneLocal rates confirmed
Wk -62026-04-03Principal cast offers outCastingR. KaplanDoneMaya, Reyes, Okafor
Wk -62026-04-05Location scout — diner, market, rooftopLocationsB. RuizDone
Wk -52026-04-10Cast confirmed; contracts signedCastingR. KaplanIn progressSuspect pending
Wk -42026-04-17Location agreements + permits filedLocationsB. RuizIn progressMarket permit 2 wks
Wk -32026-04-24Camera / lighting package bookedCameraA. KimuraNot started
Wk -22026-05-01Tech scout (all HODs)ProductionS. MoreauNot started
Wk -22026-05-02Insurance bound; COIs to locationsProductionR. KaplanNot started
Wk -12026-05-08Final shooting schedule lockedProductionS. MoreauNot started
Wk -12026-05-11Day 1 call sheet outProductionS. MoreauNot startedBy 18:00
Week:
Weeks before day one. Negative numbers keep the sheet honest about how little time is left.
Status:
Not started / In progress / Done / Blocked. Nothing else — you want it scannable.

How to use it

  1. Count backwards from day one of the shoot. Most indie features need 6–8 weeks of real pre-production.
  2. Give every task an owner and a due date. "Casting" is not a task; "offer out to Reyes by Apr 10 — Producer" is.
  3. Lock the script first. Everything below it — breakdown, schedule, budget, locations — moves when the script moves.
  4. Put the tech scout and the final schedule lock in the last week, not the last day.
  5. Review it weekly with department heads. Red status on Monday is a plan; red status on Friday is a problem.

Common mistakes

  • Tasks without owners. “Casting — In progress” belongs to nobody. “Offer out to Reyes by Apr 10 — R. Kaplan” gets done.
  • Too little time. Six to eight weeks is realistic for an indie feature. Three weeks is how shoots end up without permits.
  • Tech scout on the last day. The tech scout is where you discover the rooftop has no power. Leave a week to fix what it finds.
  • Not reviewing it. A weekly ten-minute pass with department heads is the whole point.

Download the template (.xlsx)

3 tabs: a Read Me, a filled-in example for every section, and a blank copy to work in. Free — enter your email and it downloads instantly.

We'll only use this to send occasional production tips, no spam.

Don't want to do this by hand?

morrow's roadmap gives every pre-production task a due date and an owner, tied to the script and schedule — so the plan updates when the project does.

Try morrow Free for 15 Days