Templates

Free Shooting Schedule Template

July 30, 2026

A shooting schedule turns a script into shoot days: which scenes get shot when, where, and with whom. This is a blank shooting schedule template as an Excel file, with a filled-in three-day example from a sample production, Nightfall, so you can see how scenes get grouped into days.

What's in the template

  • Schedule — one row per scene with day #, date, INT/EXT, day/night, set, description, cast numbers, and pages. This is the stripboard in spreadsheet form.
  • Day Summary — one row per shoot day: scenes, total pages, locations, and which cast are on set. The at-a-glance sanity check.

The schedule

Notice the grouping in the example: Day 1 is all diner scenes (5, 12, 12A) — one location, no company move — and the night exteriors (31, 33) sit together on Day 2. That's the whole craft: group by location first, then by cast, then by day/night.

Schedule · example from “Nightfall
9 columns
Day #DateScene #INT/EXTDay/NightSetDescriptionCast #Pages
1Tue, May 12, 20265INTDAYDiner — Booth 4Reyes and Okafor compare case notes over cold coffee.2, 3, 12
1Tue, May 12, 202612INTDAYDiner — KitchenMaya confronts the line cook about the missing order.1, 41.25
1Tue, May 12, 202612AINTNIGHTDiner — KitchenClosing up alone, Maya finds the note taped under the pass.10.75
2Wed, May 13, 202627EXTDAYMain Street MarketFoot chase through the crowded stalls.2, 51.5
2Wed, May 13, 202631EXTNIGHTRooftopThe standoff at the ledge. Rain.2, 5, 31
2Wed, May 13, 202633EXTNIGHTRooftopAftermath. Sirens below.2, 30.5
3Thu, May 14, 20268INTDAYPrecinct — OfficeOkafor pulls the file; the captain wants it closed.31.5
3Thu, May 14, 202614INTNIGHTReyes's ApartmentReyes plays the voicemail again. Maya at the door.2, 11.75
Day #:
Shoot-day number, not calendar day. Day 1 is the first day with camera rolling.
Pages:
Sum these per day. If a day is over ~6 pages, it probably needs to split.

Day summary

Re-total this after every change. A day that creeps past ~6 pages, or that needs every cast member, is the day that breaks.

Day Summary · example from “Nightfall
6 columns
Day #DateScenesPagesLocationsCast on Set
1Tue, May 12, 20265, 12, 12A4DinerReyes, Okafor, Maya, Cook
2Wed, May 13, 202627, 31, 333Main Street Market, RooftopReyes, Suspect, Okafor
3Thu, May 14, 20268, 143.25Precinct, Reyes's ApartmentOkafor, Reyes, Maya

How to use it

  1. Start from your breakdown: one row per scene, with INT/EXT, day/night, set, cast, and page count.
  2. Group scenes by location first — company moves cost hours. Then by cast availability, then by day/night.
  3. Assign a day number and date to each row. Aim for 4–6 pages a day on an indie shoot; less for action or kids.
  4. Keep night exteriors together and late in the week, so the crew’s turnaround doesn’t fight the schedule.
  5. Re-total the pages per day after every change. The day that quietly crept to 9 pages is the one that breaks.

Common mistakes

  • Scheduling in script order. Script order is for reading. Shoot order is for locations and cast.
  • Ignoring turnaround. A night shoot that wraps at 03:00 cannot be followed by a 07:00 call. Put nights at the end of the week.
  • Forgetting company moves. Moving locations costs two to three hours of a day. Two moves in one day is a short day.
  • Not re-totalling pages. The schedule that looked fine in week one has quietly become 8 pages on Day 4.

For the full method, read How to Create a Shooting Schedule.

Download the template (.xlsx)

5 tabs: a Read Me, a filled-in example for every section, and a blank copy to work in. Free — enter your email and it downloads instantly.

We'll only use this to send occasional production tips, no spam.

Don't want to do this by hand?

morrow builds the shooting schedule from your script automatically — grouped by location, cast, and day/night — and optimizes it for the fewest shoot days.

Try morrow Free for 15 Days