Blog/Locations

Do You Need a Film Permit to Shoot?

Melike IşıkSeptember 29, 2026

Usually, yes. If you are shooting on public property with a crew and equipment, most cities require a film permit, and shooting without one risks a shutdown, a fine, and void insurance. On private property you need the owner's written agreement instead of a city permit. The real cost is rarely the fee. It is the lead time and the required officers.

The question a film office is really asking is whether your shoot affects other people or public space. A phone in your hand on a sidewalk affects no one. A three-ton grip truck, a lighting stand on the road, and a crew of twelve affect everyone. Between those two is where permits live.

SituationPermit?What you need
Public street, crew and gearYesCity film permit, often police + parking holds
Public park or plazaUsuallyPermit from the parks or film office, set fee
Private home or businessNo (city)Owner's location agreement, in writing
Private property, blocking a public streetYesLocation agreement plus a city permit
Handheld, no gear, no impactOften noCheck the local rule; small crews still get stopped
Any drone workYesAviation authority clearance on top of the film permit
  • The legal right to be there with a crew, on those dates, for those hours.
  • Parking holds, so the truck and the cast trailer have somewhere to be at 6 a.m.
  • Traffic control, the police or licensed officers who can stop a car for a take.
  • Cover for your insurance. Most policies require the shoot to be permitted where a permit applies.
  • A document the location and the rental house will ask to see before they hand over the keys or the gear.

Longer than first-time producers expect, and it does not compress. A straightforward interior on a quiet street might clear in a week. Anything with a road closure, a stunt, weapons, or a drone runs two to three weeks, because a second agency has to sign off.

Permit lead time before shoot dayAround 15 working days out, submit the application and location details. The film office reviews over the following week. If police, fire, or road closures are involved, those agencies sign off. The permit issues a few days before the shoot day.~15 DAYS OUTApply~10 DAYS OUTOffice review~5 DAYS OUTAgency sign-off~2 DAYS OUTPermit issuedShoot day
A typical permit lead time. The application goes in about three weeks out; the film office reviews; police and fire sign off if needed; the permit issues a few days before the shoot. Miss the front of this and the shoot day moves.
Permit versus location agreement by property typePublic street or park needs a city permit. Private interior needs a location agreement only. Private exterior that affects a public street needs both a location agreement and a city permit.City permitLocation agr.Public streetYesNoPublic parkYesNoPrivate interiorNoYesPrivate exterior + streetYesYes
Which paperwork each location needs. Public ground needs a city permit; private property needs the owner's agreement; a private location that spills onto a public street needs both.

Permits are decided at the location scout, where you learn whether a place is even permittable, and they land on the pre-production schedule as dated tasks. The fees, officers, and holds are a budget line in how to budget a film.

Do I need a permit to film on the street?

Usually yes, if you are on public property with a crew, gear, or anything that affects other people. A tripod and a small crew on a sidewalk often needs a permit even when a phone in your hand does not. The line most cities draw is equipment on public ground and any impact on traffic or the public.

Do I need a permit to film on private property?

Not a city permit, but you need the owner’s written permission, a location agreement. If you block a public street or sidewalk from that private property, or your work affects neighbors, the city permit can come back into play.

How much does a film permit cost?

It varies widely by city, from free or a nominal fee for a student or micro-budget shoot to hundreds or thousands of dollars a day for a full crew, plus the cost of any required police or fire officers and parking holds. Budget the officers and the holds, not just the permit fee.

How long does it take to get a film permit?

Commonly one to three weeks. Many city film offices ask for a lead time of about 10 to 15 working days, longer if the shoot needs road closures, and they will not rush it for you. Apply as soon as the location and date are set.

What happens if you film without a permit?

Best case, nothing. Worse cases: the police or a bylaw officer shuts you down mid-scene, you lose the day, you are fined, and your insurance will not cover a claim on an unpermitted shoot. Rental houses and some locations also ask to see the permit before they release gear or the space.

Melike Işık

Producer and founder of morrow. Writes about the unglamorous parts of pre-production.

Don't want to do this by hand?

morrow puts permit lead times on the pre-production schedule as tasks with due dates, so the 15-day application does not become the thing that moves your shoot day.

Try morrow Free for 15 Days